User Tools

Site Tools


rini:to-do_2011

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Next revision Both sides next revision
rini:to-do_2011 [2011/04/11 03:31]
ben
rini:to-do_2011 [2011/04/11 04:49]
ben [To-Do]
Line 19: Line 19:
  
 === Mast === === Mast ===
- +  ​New Windex
-  ​<​del>​Remove lost/​dropped halyard blocks from center of mast</​del>​ DONE! +
-  * <​del>​Either get 12-20 screws for spreaders or drill out to MM size</​del>​ Drilled and tapped to M6!+
   * Replace masthead lamp with LED   * Replace masthead lamp with LED
   * Install baton to lift backstay over sail headboard when tacking?   * Install baton to lift backstay over sail headboard when tacking?
rini/to-do_2011.txt · Last modified: 2011/04/28 04:18 by ben