User Tools

Site Tools


rini:to-do_2011

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Next revision Both sides next revision
rini:to-do_2011 [2011/03/18 09:14]
ben [Bottom painting supplies]
rini:to-do_2011 [2011/04/11 04:49]
ben [Completed]
Line 1: Line 1:
  
-==== Bottom painting supplies ==== +
-  * masks +
-  * gloves +
-  * scrapers +
-  * masking tape +
-  * drop cloths +
-  * containers to mix epoxy paint (that won't melt, tin cans maybe) +
-  * beer +
-  * bourbon+
 ==== Misc Info ==== ==== Misc Info ====
  
Line 18: Line 10:
  
 ==== To-Do ==== ==== To-Do ====
- 
-=== Long-term === 
-  * Safety lines - or at least a bow pulpit 
-  * Lazy jacks? 
-  * Window replacement 
-  * Find replacement mast support pole? Need to deal with the top section of the pole, quite a bit of rust.  
- 
  
 === Engine/​Systems === === Engine/​Systems ===
Line 34: Line 19:
  
 === Mast === === Mast ===
- +  ​New Windex
-  ​Remove lost/​dropped halyard blocks from center of mast +
-  * Either get 12-20 screws for spreaders or drill out to MM size+
   * Replace masthead lamp with LED   * Replace masthead lamp with LED
   * Install baton to lift backstay over sail headboard when tacking?   * Install baton to lift backstay over sail headboard when tacking?
 +  * Forestay- rubs against jib halyard sheave, move it outside of the sheave position or remember to keep backstay loose (Found a suitable piece of steel to use to move the stay forward a centimeter or two)
 +  * Replace lower boom kicker bracket (maybe upper too?) with something more sturdy
  
 === Sails/​Rigging === === Sails/​Rigging ===
  
   * Shorten lower boom kicker length and re-attach (will allow more downward movement), need hacksaw and riveter at the boat   * Shorten lower boom kicker length and re-attach (will allow more downward movement), need hacksaw and riveter at the boat
-  * Forestay- rubs against jib halyard bearing, move it outside of the bearing position or remember to keep backstay loose +  * <del>Re-install washers on jib halyard block</​del>​
-  * Re-install washers on jib halyard block+
   * **New sail cover**   * **New sail cover**
  
 === Hull === === Hull ===
  
-  * Patch small paint crack just above water line on starboard side near stern+  * <​del>​Sand and</​del>​ varnish tiller, needs two more coats 
   * Replace toe-rails   * Replace toe-rails
   * Replace hatch-cover   * Replace hatch-cover
   * Install external hatch handle   * Install external hatch handle
   * Replace wood underneath spinnaker barber-haul cleats   * Replace wood underneath spinnaker barber-haul cleats
-  * Check rudder bearings and shaft condition 
-  * Bottom 
   * Reattach (replace?) cockpit floorboards   * Reattach (replace?) cockpit floorboards
-  * Sand and varnish tiller+  * Patch random cracks on deck & in cockpit
  
 === Cabin === === Cabin ===
Line 69: Line 51:
   * Sand and varnish walls underneath added deck supports (varnish is peeling)   * Sand and varnish walls underneath added deck supports (varnish is peeling)
   * Install hook under cabin hatch to allow easier spinnaker stowage (have brass hooks, but maybe something with a latch would be better)   * Install hook under cabin hatch to allow easier spinnaker stowage (have brass hooks, but maybe something with a latch would be better)
 +
 +=== Long-term ===
 +  * Safety lines - or at least a bow pulpit
 +  * Lazy jacks?
 +  * Window replacement
 +  * Find replacement mast support pole? Need to deal with the top section of the pole, quite a bit of rust. 
  
 ==== Completed ==== ==== Completed ====
 +  * Weld tiller bracket back together
 +
 +=== Hull ===
 +
 +  * <​del>​Patch small paint crack just above water line on starboard side near stern</​del>​
 +  * <​del>​Check rudder bearings and shaft condition</​del>​ Should be okay for a long time to come.
 +  * <​del>​Bottom paint</​del>​
 +
 +=== Mast ===
 +
 +  * <​del>​Remove lost/​dropped halyard blocks from center of mast</​del>​ DONE!
 +  * <​del>​Either get 12-20 screws for spreaders or drill out to MM size</​del>​ Drilled and tapped to M6!
 +
 +==== Bottom painting supplies ====
 +
 +  * <​del>​masks</​del>​
 +  * <​del>​gloves</​del>​
 +  * <​del>​scrapers</​del>​
 +  * <​del>​masking tape</​del>​
 +  * <​del>​drop cloths</​del>​
 +  * <​del>​containers to mix epoxy paint (that won't melt, tin cans maybe)</​del>​
 +  * <​del>​sand paper</​del>​
 +  * <​del>​sanding blocks</​del>​
 +  * <​del>​beer</​del>​
 +  * <​del>​bourbon</​del>​
rini/to-do_2011.txt · Last modified: 2011/04/28 04:18 by ben