This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Next revision Both sides next revision | ||
iw31:to-do [2015/05/05 07:28] ben [Spring 2015] |
iw31:to-do [2015/12/14 14:13] ben [Fall 2014] |
||
---|---|---|---|
Line 2: | Line 2: | ||
===== Spring 2015 ===== | ===== Spring 2015 ===== | ||
- | * Install deck plate for chain locker | + | * <del>Install deck plate for chain locker</del> DONE! |
- | * repair sail cover | + | * <del>repair sail cover</del> |
- | * new curtains, fix-up curtain rods | + | * <del>new curtains, fix-up curtain rods</del> |
* mast cabling connector install | * mast cabling connector install | ||
* add switch for paralleling relay control? | * add switch for paralleling relay control? | ||
* new battery charger? | * new battery charger? | ||
- | * Re-wire 220v interface, it's a fire hazard | + | * Re-wire 220v interface |
+ | * Find good insulation and storage bins to re-do ice box | ||
+ | * make styrofoam cutter with soldering iron & wire & coping saw? | ||
+ | * Find flexible conduit for wiring runs | ||
+ | * new diaphragm bilge pump install (done save clamps, two wood screws, and something to hold output hose from shaking) | ||
+ | * replace last big of bilge pump line, it's brittle | ||
+ | * <del>Move cooker gimbals forward in the box, outwards on the sides (thinner boards for mounts), and mount the cooker and pot holder</del> Done! | ||
+ | * <del>Drill Ikea mixing bowls for pre-heating cups on cooker, cut them down by 1.5cm vertically to fit</del> | ||
+ | * Fix-up the head: [[http://www.groco.net/svc-main.htm|http://www.groco.net/svc-main.htm]] | ||
+ | * Add mixing bowl below water separator/fuel filter | ||
+ | |||
==== Fall 2014 ==== | ==== Fall 2014 ==== | ||
- | Re-wire definitively necessary: | + | Re-wire: |
* At some point, when all is ready, rip out the old wiring for everything except cabin lamps | * At some point, when all is ready, rip out the old wiring for everything except cabin lamps | ||
Line 39: | Line 48: | ||
* Bilge pump (3.5m) | * Bilge pump (3.5m) | ||
* 12v Accessory ports (3m) | * 12v Accessory ports (3m) | ||
- | * Install new switches in lamp switch panel (picked up some awesome old metal toggles from [[http://www.tackel.se|Tackel & Tåg]] | + | * <del>Install new switches in lamp switch panel (picked up some awesome old metal toggles from [[http://www.tackel.se|Tackel & Tåg]]</del> |
* Fit new bilge/accessory port plate | * Fit new bilge/accessory port plate | ||
* Install new 12v port near main battery switches for search lamp | * Install new 12v port near main battery switches for search lamp | ||
Line 62: | Line 71: | ||
* Need carbon monoxide detector | * Need carbon monoxide detector | ||
* <del>Fashion a deck ring</del> | * <del>Fashion a deck ring</del> | ||
- | * Mount flashing/heat shield | + | * <del>Cut hole in deck and mount flue vent/deck ring</del> |
- | * Mount heater | + | * Mount flashing/heat shield - maybe not necessary |
- | * Mock up flue pipe | + | * <del>Mount heater</del> |
+ | * <del>Mock up flue pipe</del> | ||
+ | * <del>Weld up flue</del> | ||
Other: | Other: | ||
- | * Get a bulkhead mount compass for shit's sake, or re-fill the old compasses and install those on the bulkheads? ([[http://www.amazon.com/Ritchie-564128-BN-202-Navigator/dp/B000TI020G/ref=sr_1_12?s=boating-water-sports&ie=UTF8&qid=1407913481&sr=1-12&keywords=compass+bulkhead|Ritchie BN-202 Navigator]] looks lovely, but two would be outrageously expensive) | + | * Get a bulkhead mount compass, or re-fill the old compasses and install those on the bulkheads? ([[http://www.amazon.com/Ritchie-564128-BN-202-Navigator/dp/B000TI020G/ref=sr_1_12?s=boating-water-sports&ie=UTF8&qid=1407913481&sr=1-12&keywords=compass+bulkhead|Ritchie BN-202 Navigator]] looks lovely, but two would be outrageously expensive) |
* Re-fill and install original Sestrel compasses on the cockpit bulkheads? May need lower teak wedges to get a better viewing angle | * Re-fill and install original Sestrel compasses on the cockpit bulkheads? May need lower teak wedges to get a better viewing angle | ||
- | * Re-glass various issues: | + | * Re-glass various small spots: |
* Main bulkhead near mast foot | * Main bulkhead near mast foot | ||
* Below-board bulkhead forward of engine | * Below-board bulkhead forward of engine | ||
Line 78: | Line 89: | ||
==== Spring 2014 ==== | ==== Spring 2014 ==== | ||
- | * CO detector & heating install (deck cap teak ring) | + | * CO detector <del>& heating install (deck cap teak ring)</del> |
* <del>Seacocks & gummi box</del> | * <del>Seacocks & gummi box</del> | ||
- | * get some OARS! | + | * <del>get some OARS!</del> Done, 150dkk oars achieved! |
Rudder stuffing box repair: | Rudder stuffing box repair: | ||
Line 143: | Line 154: | ||
* <del>Stop mail delivery</del> | * <del>Stop mail delivery</del> | ||
* <del>Get software together</del> | * <del>Get software together</del> | ||
- | * Order and install chain pipe (http://www.toplicht.de/en/shop/anker-und-ketten/kettenrolle-ketteneinlauf-und-kluese/ketteneinlaeufe/ketteneinlauf-oval-bronze-spartan) - ordered, arrived, too afraid to install. | + | * <del>Order and install chain pipe (http://www.toplicht.de/en/shop/anker-und-ketten/kettenrolle-ketteneinlauf-und-kluese/ketteneinlaeufe/ketteneinlauf-oval-bronze-spartan) - ordered, arrived, too afraid to install.</del>Deck plate installed. |
Line 233: | Line 244: | ||
* adjust halyard exit sheaves to roll better (main & topping lift sheaves rub together), maybe replace with something [[http://n-u.dk/product/faldindfoerer-rf-krum-32x83-7362/|like this]] | * adjust halyard exit sheaves to roll better (main & topping lift sheaves rub together), maybe replace with something [[http://n-u.dk/product/faldindfoerer-rf-krum-32x83-7362/|like this]] | ||
* reinforce/re-attach chain plate boards to hull below deck | * reinforce/re-attach chain plate boards to hull below deck | ||
- | * install new backstay adjuster | + | * <del>install new backstay adjuster</del> |
- | * install block on out-haul | + | * <del>install block on out-haul</del> not great, but there and working |
* <del>replace reefing blocks</del> 25mm block replaced the broken one | * <del>replace reefing blocks</del> 25mm block replaced the broken one | ||
* run reefing lines to cockpit | * run reefing lines to cockpit | ||
Line 244: | Line 255: | ||
===== Sails ===== | ===== Sails ===== | ||
- | * repair tear in mainsail | + | * <del>repair tear in mainsail</del> (new sails in 2013) |
- | * re-attach jib UV cover | + | * <del>re-attach jib UV cover</del> (new sails in 2013) |
- | * repair zipper on lazy pack where it's separating | + | * <del>repair zipper on lazy pack where it's separating</del> |
===== Engine ===== | ===== Engine ===== | ||
Line 255: | Line 266: | ||
* consider using garmin NMEA 2000 connectors for mast lamp wiring- they're waterproof and available: | * consider using garmin NMEA 2000 connectors for mast lamp wiring- they're waterproof and available: | ||
* http://www.nordjysk-marine.dk/product/nmea-200-loest-hun-stik-1000051/ & http://www.nordjysk-marine.dk/product/nmea-2000-loest-han-stik-1000050/ | * http://www.nordjysk-marine.dk/product/nmea-200-loest-hun-stik-1000051/ & http://www.nordjysk-marine.dk/product/nmea-2000-loest-han-stik-1000050/ | ||
- | * repair engine instrument panel warning lights, switches, and alarm | + | * <del>repair engine instrument panel warning lights, switches, and alarm</del> |
* <del>replace masthead lamp with tri-color & anchor LED fixture</del> | * <del>replace masthead lamp with tri-color & anchor LED fixture</del> | ||
- | * wire masthead switch for tri-color vs. led | + | * <del>wire masthead switch for tri-color vs. white</del> |
* <del>replace motor lamp with LED</del> | * <del>replace motor lamp with LED</del> | ||
* hell, replace all lamps with LED | * hell, replace all lamps with LED | ||
* replace switch panel & fuse box with joint switch and breaker switch panel (see mouser link elsewhere for 30v 10amp panel-mount breakers) | * replace switch panel & fuse box with joint switch and breaker switch panel (see mouser link elsewhere for 30v 10amp panel-mount breakers) | ||
- | * need gas solonoid, nav lights, engine light, anchor light, spreader lights, instruments, auto-pilot/aux, cabin lights, water pump (that's 10 so far) | + | * <del>need gas solonoid</del>(NA), nav lights, engine light, anchor light, spreader lights, instruments, auto-pilot/aux, cabin lights, water pump (that's 10 so far) |
* <del>replace main battery switch w/ 2-battery system</del> | * <del>replace main battery switch w/ 2-battery system</del> | ||
* <del>add house battery</del> | * <del>add house battery</del> | ||
Line 285: | Line 296: | ||
* <del>lengthen/add loop to secondary bilge pump line</del> deemed not necessary | * <del>lengthen/add loop to secondary bilge pump line</del> deemed not necessary | ||
* [[#faucet_replacement|replace faucet & sink in head]] | * [[#faucet_replacement|replace faucet & sink in head]] | ||
- | * sew new curtains and <del>install new curtain rods</del> | + | * <del>sew new curtains and</del> <del>install new curtain rods</del> |
* install panel compasses (danforth a140 dual-read seems like a nice idea) | * install panel compasses (danforth a140 dual-read seems like a nice idea) | ||
* <del>replace instruments?</del> | * <del>replace instruments?</del> | ||
Line 291: | Line 302: | ||
* convert old winches to internal ratcheting? would need to replace bottom center gear with 3 or 4 small ratchets (pawls I think?) instead... need to sketchup something first. basically the idea would be to cut off the gear from the shaft, and install 4 pins with 4 pawls. | * convert old winches to internal ratcheting? would need to replace bottom center gear with 3 or 4 small ratchets (pawls I think?) instead... need to sketchup something first. basically the idea would be to cut off the gear from the shaft, and install 4 pins with 4 pawls. | ||
* <del>remove side lantern mounts on pulpit</del> | * <del>remove side lantern mounts on pulpit</del> | ||
- | * remove stern lantern & mount from stern rail | + | * <del>remove stern lantern & mount from stern rail</del> |
- | * remove stern lantern cabling | + | * <del>remove stern lantern cabling</del> |
* remove wall paper, glue, oil teak, re-vaneer where necessary | * remove wall paper, glue, oil teak, re-vaneer where necessary | ||
- | * shorten starboard quarter berth and install nav desk | + | * <del>shorten starboard quarter berth and install nav desk</del>won't bother |
* make two cushions for cockpit table | * make two cushions for cockpit table | ||
* <del>replace seal on instrument panel, maybe replace the entire enclosure with a custom box</del> not necessary | * <del>replace seal on instrument panel, maybe replace the entire enclosure with a custom box</del> not necessary | ||
* add chain locker in the bow? could be a complicated modification, could use a bronze port into the lower area with little more modification than cutting a hole | * add chain locker in the bow? could be a complicated modification, could use a bronze port into the lower area with little more modification than cutting a hole | ||
* repair hatch | * repair hatch | ||
- | * repair hatch seal & add pins to closing shackles | + | * repair hatch seal<del> & add pins to closing shackles</del> |
* re-glass ventilator boxes | * re-glass ventilator boxes | ||
* <del>repair/replace ventilators</del> | * <del>repair/replace ventilators</del> |